Wombarra Stormwater Drainage Tunnel Project - Turnkey Electrical Solution by Rutherford Power

Scope of Works: -

  • Liaise with Railways for Provision of 33,000V Supply
  • Design, Supply and Installation of 33,000V Switchyard including Overhead Lines
  • Design Electrical Distribution System for Entire Operations
  • Supply 2 Flameproof 4 Outlet 1,000V DCB
  • Supply and Install 800kVA 33,000V to 415V Transformer
  • Design and Install Site Earthing
  • Supply and Install 500kVA 415V to 1,000V Mining Style Substation
  • Supply and Install 415V Surface Distribution Board and Switchyard
  • Design System and Supply around 2,000 Metres of 1,000V Mining Type Cables complete with Plugs and Couplers
  • Supply and Install Various 415V Surface Cables

Note: This project was unique as the surface was a normal construction supply but as it was on an old mining lease, underground was installed to coal mining regulations