Wombarra Stormwater Drainage Tunnel Project - Turnkey Electrical Solution by Rutherford Power
Scope of Works: -
- Liaise with Railways for Provision of 33,000V Supply
- Design, Supply and Installation of 33,000V Switchyard including Overhead Lines
- Design Electrical Distribution System for Entire Operations
- Supply 2 Flameproof 4 Outlet 1,000V DCB
- Supply and Install 800kVA 33,000V to 415V Transformer
- Design and Install Site Earthing
- Supply and Install 500kVA 415V to 1,000V Mining Style Substation
- Supply and Install 415V Surface Distribution Board and Switchyard
- Design System and Supply around 2,000 Metres of 1,000V Mining Type Cables complete with Plugs and Couplers
- Supply and Install Various 415V Surface Cables
Note: This project was unique as the surface was a normal construction supply but as it was on an old mining lease, underground was installed to coal mining regulations